Roadmap ​

The grand plan for jangkar-testing-engines. It says where the engine is, where it goes, in what order, and what has to be true before each phase starts. Phases are ordered by Vinson's priority: business logic before UI, gates before conveniences, one adopter proven before the next stack is built.

Dates are deliberately absent. Each phase has exit criteria instead. A phase is done when its criteria hold on the engine and on at least one adopter.

0. Where we are (v0.1.0, released 2026-09-19) ​

Shipped and self-tested:

  • Vitest, ESLint, TypeScript, Stryker configs with the strict thresholds from testing-standard.md.
  • Reusable quality-gate workflow: doctor, lint, typecheck, unit + coverage, integration + system with local Supabase, mutation on src/core.
  • Claude Code tooling: rules block, /spec-first, /test-review, /coverage-gaps, /system-test, test-auditor agent, Stop hook, pre-commit hook.
  • CLI jangkar-test init | retrofit | doctor | upgrade, templates for nextjs and node-api, reference example tax-calc.

Honest gaps, in order of how much they weaken the gate today:

  1. No adopter has a real feature behind the gate. yespajak is retrofitted but src/core holds only example.ts. The engine has never caught a real bad test.
  2. The layering rule is prose, not a gate. src/core importing @supabase/*, next/*, fetch, or node:fs is forbidden in CLAUDE.testing.md but nothing fails. This is the one rule everything else depends on.
  3. Branch protection is off. The engine repo and yespajak are private on the free plan, so CI is advisory. "Never merge red by hand" is the only guard.
  4. yespajak has no canonical remote. The local repo and the public vinsonsid/yespajak have unrelated histories. Until that is decided nothing there is gated remotely.
  5. upgrade only re-pins. It does not refresh skills, hooks, or the rules block, so adopters drift from the engine as soon as v0.2.0 ships.
  6. Python, Playwright, Expo are stubs. Documented, not built.
  7. No release discipline. No tag automation, no changelog check, no rule for what a breaking change is.

1. Principles that do not change between phases ​

  • Tests live with the code. The engine ships gates, configs, skills, scaffolds. Never tests.
  • CI on the remote is the only authority. Local green, hook green, agent "tests pass" are hints.
  • Thresholds only go up. Any lowering needs a commit body saying why and an issue to restore it.
  • Mechanical before procedural. If a rule can be a lint rule or a doctor check, it must be. Skills and agents cover only what cannot be mechanised.
  • Prove on one adopter before generalising. Every phase lands on yespajak (or the next real project) before it is called done.
  • The engine dogfoods itself. The engine repo passes its own standard at the strictest level it asks of others.

2. Phases ​

Phase 0: prove the gate on a real feature ​

Goal: the engine catches at least one real defect or fake test on yespajak before any new capability is built. Nothing else is worth doing if this fails.

Work:

  • Decide the canonical yespajak repo (local rewrite vs public vinsonsid/yespajak), push, and run the gate on the remote. Open decision, see section 5.
  • Ship the first real yespajak feature end to end: /spec-first, implement, /test-review, PR, CI green. Record what the auditor found, what it missed, and how long the loop took.
  • Decide branch protection: public repo, Pro plan, or documented "advisory gate" mode. Open decision, see section 5.
  • Add a lightweight docs/decisions/ folder (one file per decision, date, context, choice). Backfill the decisions already made.

Exit criteria:

  • One merged yespajak PR whose history shows spec, red tests, green tests, auditor findings resolved.
  • A written note of the first thing the gate caught. If it caught nothing, the phase is not done: tighten until it does.

Phase 1 hardening (v0.2.x): make the current promises mechanical ​

Goal: every rule in testing-standard.md sections 2, 5, and 6 fails CI without a reviewer.

Gates to add:

  • Layering as a lint rule. Done in v0.2.0 as configs/eslint/layering.mjs. no-restricted-imports scoped to src/core/** banning @supabase/*, next/*, @anthropic-ai/*, node:*, fetch, and any ../adapters or ../app path. Same for src/adapters/** importing app. Consider dependency-cruiser if the ESLint rule cannot express "no I/O".
  • Doctor covers the rest of section 5. Commented-out tests, console.error in passing tests (Vitest onConsoleLog fail), snapshot-only assertions in tests/unit, __mocks__ of the module under test, it.todo on a merged branch.
  • Flakiness policy. retry: 0 everywhere. A test that fails on rerun without a code change is quarantined by moving it to tests/quarantine/ with an issue link, and doctor fails if quarantine is older than 14 days.
  • Time budgets. Unit suite under 60 s, integration under 5 min, in CI. A budget breach is a warning first, an error after phase 1 exit.
  • Coverage per directory. Report src/core and src/adapters separately in the step summary so a well-covered core cannot hide an untested adapter.
  • Incremental mutation by default. Stryker incremental cache is already restored in CI. Make the PR job run on changed core files only and the nightly run do the full set with a trend line.

Tooling to add:

  • upgrade that refreshes. Done in v0.2.0. Re-pins, re-copies skills, agents, hooks, and the rules block between the BEGIN/END markers, and prints what changed. doctor fails on drift from the installed engine.
  • doctor --ci JSON output so a fleet tool (phase 4) can read it.
  • PR template with the Definition of Done from section 8, installed by retrofit.
  • Anthropic fixtures. An msw handler set plus a record helper that captures a real call once into tests/fixtures/anthropic/*.json and replays it after. Needed for yespajak now, generalises to phase 3.
  • Supabase integration recipe. A documented tests/integration/setup.ts that resets the local database per file, plus a seed convention, so adapter tests do not leak state.

Skills and agents:

  • /spec-first gains a "boundary table" section for money, date, and tax inputs so rounding edges are always enumerated.
  • test-auditor gains a fixed checklist output (tautology, mocked-away logic, missing edge, assertion strength, layering violation) with a pass or fail per item, so its report is comparable across runs.
  • New /mutation-survivors: reads the Stryker report and turns each surviving mutant into a proposed test.

Exit criteria:

  • A deliberately bad PR on yespajak (core importing Supabase, a tautological test, a lowered threshold, a .only) fails in CI at every one of those points with no human review.
  • upgrade v0.2.0 on yespajak leaves doctor green with refreshed tooling.

Phase 1b: Python backend ​

Goal: the same standard for a Python service, with no second set of rules to remember.

  • configs/python/pyproject.fragment.toml: pytest, pytest-cov with fail-under = 80 on src/core and src/adapters, ruff strict, mypy --strict, mutmut on src/core with a 70 break, import-linter contracts for the layering rule.
  • jangkar-test init --stack python and retrofit for a pyproject.toml project. The CLI stays plain Node and works from the submodule path.
  • quality-gate.yml gains a python input that switches the matrix. Same job names so branch protection contexts do not change.
  • Stop hook and pre-commit hook detect pyproject.toml and run pytest instead of vitest.
  • examples/tax-calc-py: the same PPh21 and PPN example in Python, so the two examples can be diffed for parity.

Exit criteria: one Python project (or the example) passes the full gate on a remote, and doctor reports the same check names as the Node stack.

Phase 2: frontend and mobile ​

Goal: UI and device tests exist and are gated, at a lower coverage floor than logic, without weakening the logic gates.

Web:

  • configs/vitest/react.mjs gets React Testing Library, jest-dom, and a browser mode option. Component tests cover behaviour, not markup.
  • configs/playwright/base.ts: Playwright against next build && next start with local Supabase, e2e/ directory, one smoke flow per user-facing use case named after its spec.
  • Reusable e2e.yml replaces the placeholder: build, start, seed, run, upload trace on failure.
  • Accessibility gate: axe on every Playwright page visit, zero serious violations.
  • Visual regression: Playwright screenshots on a fixed viewport for pages that are mostly layout, opt-in per page.
  • App-layer coverage floor of 60 percent, reported separately, raised as it stabilises.

Mobile:

  • templates/mobile-expo: Expo project with src/core under the standard Vitest gates, Maestro flows in e2e/flows/*.yaml, one EAS build profile for CI.
  • e2e.yml gains a maestro job on a macOS runner with an iOS simulator.

Skills:

  • /e2e-first: writes the Playwright or Maestro flow from a spec's acceptance criteria before the UI exists.
  • test-auditor learns UI anti-patterns: asserting on class names, sleeping instead of waiting, screenshots as the only assertion.

Exit criteria: yespajak (or the next Next.js project) has one Playwright flow per system test, gated on the remote, and the e2e job runs in under 10 minutes.

Phase 3: LLM-specific quality ​

Goal: features that call Claude are held to a bar as real as tax calculations. yespajak already calls the Anthropic SDK, so this phase is not optional for the first adopter.

  • Structured output contracts. Every LLM adapter returns a typed shape validated at the boundary (zod or equivalent). A schema mismatch is an adapter test failure, not a runtime surprise.
  • Golden evals. evals/<feature>/cases.jsonl with input, expected fields, and a rubric. Deterministic checks first (fields present, numbers within tolerance, forbidden phrases absent). An LLM-judge only where a deterministic check is impossible, with the judge prompt versioned in the repo.
  • Eval gate. A PR touching src/adapters/llm/** or prompts/** runs the eval set against recorded fixtures by default and against the live API on a label. Pass rate floor per feature, floor only goes up.
  • Cost and latency budgets per feature, asserted in the eval run.
  • Prompt versioning. Prompts are files under prompts/, imported by adapters, so a prompt change is a diff and the auditor can see it.
  • /eval-first skill: builds the golden cases from a spec's acceptance criteria before the prompt is written.

Exit criteria: the yespajak classification or extraction feature has a golden set of at least 30 cases, a fixed pass floor, and a PR that degrades it fails CI.

Phase 4: fleet operations ​

Goal: five or more adopters stay on the current engine without hand work.

  • jangkar-test fleet reads a fleet.json (repo list) and reports each adopter's pinned engine version, last gate result, and coverage and mutation trend using doctor --ci output and the GitHub API.
  • Automatic upgrade PRs: a workflow in the engine repo opens upgrade vX.Y.Z PRs on every adopter on each release. The adopter's own gate decides.
  • Codemods in upgrade for breaking config changes, with a --dry-run.
  • Org-level rulesets replace per-repo branch protection once the plan or visibility decision allows it.
  • A small status page (GitHub Pages from the engine repo) with one row per adopter.

Exit criteria: a release of the engine reaches every adopter as a green PR within a day with no manual steps.

Phase 5: beyond correctness ​

Only after phases 0 to 3 hold. Each of these is a separate opt-in job in quality-gate.yml, off by default, so the core gate never gets slower.

  • Security: npm audit at high, secret scanning, semgrep with a small owned ruleset.
  • Performance: autocannon budgets for API routes, Lighthouse budgets for pages.
  • Post-deploy smoke: one Playwright flow against production after each deploy, alerting on failure.
  • Dependency policy: Renovate config shipped by retrofit, majors require a green gate plus a manual label.

3. Engine self-quality (every phase) ​

  • The engine passes jangkar-test doctor on itself where the checks apply, and npm run check runs in engine-ci.yml on every PR.
  • Every CLI command has a test in tests/ that runs it against a temporary project and asserts on the filesystem, not on stdout.
  • Every reusable workflow change is exercised by a caller in examples/ on a PR before a tag.
  • Mutation testing on bin/ and configs/ once they hold real logic (phase 1 hardening adds enough).

4. Release and versioning policy ​

  • Semver. A major changes a threshold, a check name, a job name, or a config export. A minor adds a gate, check, skill, or stack. A patch fixes behaviour without changing what passes.
  • Every release: CHANGELOG.md entry, git tag vX.Y.Z, engine-ci green, ci/github and .github/workflows in sync, mirrored by tests/ci.test.mjs.
  • A release that adds a gate is announced with the adopter command to pass it, so an upgrade PR never arrives red without explanation.
  • Deprecations live for one minor before removal.

5. Open decisions ​

These block or shape phases and only Vinson can make them.

DecisionBlocksOptions
Canonical yespajak repoPhase 0Force-push the local repo over the public one; keep the public one and re-retrofit it; rename one
Branch protection on private reposPhase 0 exitMake repos public; GitHub Pro; accept advisory mode with a written "never merge red" rule
Engine repo visibilityPhase 4Private means every adopter needs a GitHub token to npm install; public removes that friction
Second adopterPhase 1 hardening exitA Node API project would exercise the second template before Python or UI
Coverage floor for the app layer in phase 2Phase 260 percent proposed; could start advisory

6. Suggested order of work ​

  1. Phase 0 on yespajak, including the two decisions it needs.
  2. Layering lint rule and the upgrade refresh, released as v0.2.0. These two close the largest gaps.
  3. Rest of phase 1 hardening, released as v0.2.x patches and v0.3.0.
  4. Phase 3 LLM evals before phase 2, if yespajak's next features are LLM-heavy. Otherwise phase 2 web first.
  5. Phase 1b Python when a Python project exists, not before.
  6. Phase 4 when there are three or more adopters.
  7. Phase 5 last, opt-in.

7. What "done" looks like ​

A new Jangkar project runs one command, gets the standard, and its first feature cannot merge until spec, tests, auditor, and CI agree. An old project upgrades in one PR. A Python service, a Next.js app, an Expo app, and an LLM feature are all held to the same bar, and Vinson can see the whole fleet's health on one page.

Jangkar. Tests live with the code; CI on the remote is the only authority.